Projects

Wastewater Interceptor

This project includes preliminary design with report, route analysis, easement identification, and preparing plans and specifications to construct a wastewater interceptor to serve the projected growth of the city along state highway corridors. The engineering process includes flow analysis with projections to evaluate the wastewater interceptor sizing and ultimate service area. Project includes open cut to a depth of 45 ft and tunneling from 45 to 70 ft depths; bore and jack for a sanitary sewer under a state highway and the demolition of two existing lift stations in right of ways. Work includes surveying, preliminary studies (i.e. environmental, geotechnical, traffic control plan, hydraulic & hydrology/floodplain delineation), design (civil, structural, electrical), bidding, and construction administration.